70% Waste Diversion Study

This report by Golder Associates (March 2009) gives practical steps to increase the municipal waste diversion rate — i.e. not to landfill or incineration — to 70% and beyond in Durham Region. The capital cost is a small fraction of what would be spent on the proposed incinerator.

Note: this is a large PDF file (7.5 mbytes). The file size listed below is inaccurate.

AttachmentSize
Golder Report.pdf65.53 KB

Upcoming events

  • No upcoming events available

Events

« October 2017
SunMonTueWedThuFriSat
1234567
891011121314
15161718192021
22232425262728
293031